We rely on advanced technology to deliver Construction Projects and Engineering.
Construction of 2 Nos, 250-seater Lecture Theatre for School of Engineering & School of Applied Sciences
Location: Federal Polytechnic of Oil and Gas, Bonny, Rivers State
Scope: Structural engineering design, monitoring and inspection, and project administration of the RC-framed structures.
Key Challenges: Bonny Island where the projects are located is accessible only by boat across the sea. This created a material and logistics challenge requiring some additional value engineering and design optimization. Labour and community issues also required special attention.
Status: Completed (2022)
Construction of Library Building
Location: Federal Polytechnic of Oil and Gas, Bonny, Rivers State
Scope: Structural engineering design, monitoring and inspection, and project administration of the RC-framed structures.
Key Challenges: Bonny Island where the projects are located is accessible only by boat across the sea. This created a material and logistics challenge requiring some additional value engineering and design optimization. Labour and community issues also required special attention.
Status: Started 2020 (On-going)
Construction of Eye Hospital for Thelish Hospital Ltd
Location: Plot No. 2411, Cadastral Zone B01, Gudu District, Abuja
Scope: Structural engineering re-design, monitoring and inspection of the 4-storey RC-framed structure. Suspended floors were designed as ribbed slabs using polystyrene pots as void formers. Roof structure was cold-formed galvanized steel.
Key Challenges: Floor slab had to be redesigned from the original solid slab to ribbed in order to fully satisfy the foundation load capacity requirement.
Status: Completed (2022)
Construction of Administrative Building at NOGAPS
Location: Emeyal 1, Bayelsa State
Scope: Structural engineering design, monitoring, and inspection of the 5-storey RC-framed structure of about 1095 square meters on plan. Suspended floors were designed as waffle slabs, the footing was solid raft foundations, and the roof structure was rolled steel angles (RSA).
Key Challenges: No major challenges.
Status: Completed 2021
Construction of Manufacturing Shop Floors and Warehouses at NOGAPS
Location: Emeyal 1, Bayelsa State
Scope: Structural engineering design, monitoring, and inspection of the 60m by 60m (on plan) steel-framed structure with eaves height of 10m. RC mezzanine floors were designed as solid slabs, the footing was continuous strip, inverted Tee foundations, and the roof structure was rolled steel angles (RSA).
Key Challenges: No major challenges.
Status: Completed 2021
Construction of Roads and Civil Infrastructure at NOGAPS, Odukpani
Location: Odukpani Cross Rver State
Scope: Civil engineering design, monitoring, and inspection of about 2km of road network and storm drains, 260,000 cubic meters of bulk earthworks and site grading, 41,000 square meters of pavement surfacing and parking lots.
Key Challenges: Stockpiling and removal of unsuitable materials required detailed and extensive planning which affected projected work flows and scheduling.
Status: Completed 2022
Construction of Shopping Plaza for Messrs M&G
Location: Plot 661, Cadastral Zone A08, Wuse II, Abuja
Scope: Structural engineering design, monitoring and inspection of the 5-storey RC-framed structure of about 650 square meters on plan and with lower level basement for parking.. Suspended floors were designed as flat slabs while the roof structure was rolled steel angles (RSA).
Key Challenges: No major challenges. .
Status: Started February 2018 and completed June 2020